• Kaumuali‘i Highway • Kuhio Highway • Kapule Highway • Ma‘alo Road Kaumuali‘i Highway 8:30 a.m.-3 p.m. daily • Single-lane closure between Huakai Road and Elapaio Road in the Kekaha-bound direction for 12-inch water pipe installations. Kuhio Highway 8:30 a.m.
• Kaumuali‘i Highway
• Kuhio Highway
• Kapule Highway
• Ma‘alo Road
Kaumuali‘i Highway
8:30 a.m.-3 p.m. daily
• Single-lane closure between Huakai Road and Elapaio Road in the Kekaha-bound direction for 12-inch water pipe installations.
Kuhio Highway
8:30 a.m. – 1:30 p.m. daily
Single-lane closures between Kawaihau Road and Mailihuna Road for striping and guardrail installations.
8:30 a.m. – 3 p.m. daily
Roving single-lane closures between Kolo Road and Anini Vista Road for tree trimming.
8:30 a.m. – 5 p.m. daily
Alternating single-lane closures between Anini Vista Road and Princeville for road reconstruction work.
Kapule Highway
24-hour, seven-day-a-week closures for road resurfacing to begin Wednesday
• Closures at Halau Street and Vidinha Stadium Access Road intersections. All access will be closed.
• Closures at Ka‘ana Street intersection
All access to Ka‘ana Street west from Kapule Highway will be closed.
Ma‘alo Road
8:30 a.m. – 3:30 p.m., daily
• Single-lane closures on Ma‘alo Road in both directions between Mile Point 0.0 and Mile Point 1.0 for pavement resurfacing.