• Kaumuali‘i Highway • Kuhio Highway • Kapule Highway • Kuamo‘o Road • Waialo Road Kaumuali‘i Highway 8:30 a.m. – 3:30 p.m. daily • Between Halewili Road and Wahiawa Bridge, multiple eastbound lane closures for pavement resurfacing. 9 p.m. – 6
• Kaumuali‘i Highway
• Kuhio Highway
• Kapule Highway
• Kuamo‘o Road
• Waialo Road
Kaumuali‘i Highway
8:30 a.m. – 3:30 p.m. daily
• Between Halewili Road and Wahiawa Bridge, multiple eastbound lane closures for pavement resurfacing.
9 p.m. – 6 a.m. nightly
• At Kipu Road intersection, single-lane closures in all directions for pavement striping.
Kuhio Highway
8:30 a.m. – 3:30 p.m. daily
• Single lane closures between mile post 27 and 28.11 for road reconstruction.
9 p.m. – 6 a.m. nightly
• Single lane closures between Kawaihau Road and Inia Street for road resurfacing. Detours may be in effect.
Kapule Highway
8:30 a.m. – 3:30 p.m. daily
• Alternating lane closures and shifts in both directions between Ahukini Road and Rice Street for road resurfacing and striping operations.
Kuamo‘o Road
8:30 a.m. – 3 p.m. daily
• Speed reductions to 15 miles per hour in both directions between Mile Post 17.0 and Mile Post 17.05 for slope stabilization operations.
Waialo Road
8:30 a.m. – 3:30 p.m. daily
• Alternating single-lane closures on Waialo Road in both directions for pavement striping.
Motorists are advised that a four-way stop has been implemented at the intersection of Waialo Road and Kaumualii Highway for the duration of the project. The project is ongoing and anticipated to be complete by the end of June.